Mandatory Submission of Periodic Energy Audits (PEA)

The mandatory submission of Periodic Energy Audits (PEA) forms part of Singapore's comprehensive approach to ensure that cooling systems continue to operate efficiently throughout a building’s lifespan, allowing building owners to continuously reap energy saving benefits.

Last updated 14 March 2026
Engineers are inspecting a large building or industrial facility's cooling system for the air conditioning on rooftop building.

Submission Process

Step 1. Engage service to carry out the energy audit

Step 2. Document preparation

Applicable Buildings

Related Links