Case Study - Woh Hup Technical Hub

construction of woh hup

Construction of Woh Hup Technical Hub office block using MET (courtesy of Tanglin Corporation Private Limited) 

Project Team  

Developer: Tanglin Corporation (Private) Limited
Architect: Lander Loke Architects
Structural Engineer: Ronnie & Koh Consultants Pte Ltd
M&E Engineer: Neam Solutions
Main Contractor: Woh Hup (Private) Limited
MET Sub-Contractor: Venturer Pte. Ltd.
CLT Supplier: KLH Massivholz Gmbh
Glulam Supplier: Hasslacher Norica Timber

Date of commencement for MET structure: 10 October 2018
Date of completion for MET structure: 14 November 2018

Woh Hup Technical Hub,located along Gul Street 5, adopted various DfMA technologies such as Mass Engineered Timber (MET), Prefabricated Prefinished Volumetric Construction (PPVC) and structural steel. MET was used to construct the 4-storey office building in the project. The total Gross Floor Area for the MET structure is 2,347m2.

Glued Laminated Timber (Glulam) was used for the columns and beams while Cross Laminated Timber (CLT) was used for the floor slabs. In total, about 300 tons of MET were used in the project. To enhance the acoustic performance, 10 mm granulated acoustic mat was installed directly on the CLT slabs and then installed over with carpet. This achieved an acoustic rating in the region of STC 44. The MET components were also treated on site for termite and water resistance. 

As MET is lightweight and easy to install, the MET structure was completed in less than six weeks and had achieved productivity improvement of more than 20%. The MET installation rate was 7.1 m2/man-day, which was more efficient compared to conventional concrete structure. This is coupled with using simple machinery such as floor winch and cordless handheld tools.

Below are the dimensions of Glulam as well as CLT panels used for the project:

Glulam

Description

Dimension

Column

400mm x 560mm

Main beams

400mm x 720mm

Secondary beams

200mm x 600mm

Perimeter beams

200mm x 900mm

CLT

Each 120mm slab consists of 5 lamellas

Description

Dimension

Floor

2200mm x 5000mm

Floor

2200mm x 7500mm

Floor

2200mm x 10600mm

installation of glulam beams

Installation of glulam beams (courtesy of Venturer Pte Ltd)

istallation of clt floor slabs

Installation of CLT floor slabs (courtesy of Venturer Pte. Ltd.)

Popular e-Services

CWRS

The Construction Workforce Registration System (CWRS) is an online portal for CoreTrade and Multi-skilling registration and the renewal of Direct R1 eligibility.

Overseas Testing Management System

OTMS allows you to register the workers for Identity Verification and to check your registration status online.

Lifts and Escalators Application (LEAP) Portal

Lift and escalator owners, contractors and Specialist Professional Engineers (SPEs) can apply for and view applications for Permit to Operate (PTO) here.