×
!

Construction of Public Shelter

Qualified Persons (QP) must follow these procedures during the construction of a public shelter.

Important guidelines

In general, QPs must:

  • Comply to requirements specified in
  • Obtain “Notice of Approval” for shelter structural plans from Transit Shelter Engineering Department (TSED) and “Permit to Commence Building Works” from Building Engineering Group of BCA before construction works commence
  • Closely supervise the construction of the shelter and inform TSED before concreting of all critical structural elements
  • Ensure that construction is done in accordance to detailed manufacturer’s specifications for installation of services and equipment
  • Ensure no hacking or drilling or structural members after casting
  • Complete and assemble all protective steelworks before installation on site
  • Take corrective actions to rectify all non-conformances

Popular e-Services

CWRS

The Construction Workforce Registration System (CWRS) is an online portal for CoreTrade and Multi-skilling registration and the renewal of Direct R1 eligibility.

Overseas Testing Management System

OTMS allows you to register the workers for Identity Verification and to check your registration status online.

Lifts and Escalators Application (LEAP) Portal

Lift and escalator owners, contractors and Specialist Professional Engineers (SPEs) can apply for and view applications for Permit to Operate (PTO) here.