The Green Mark Plaque and Decal shall be affixed or installed at a prominent location outside or inside the building, such as Lobby, Reception etc. throughout the validity of the certification. A new display credential showing the new inscription should be displayed when the project is re-certified. BCA reserves the right to withdraw the approval given for the display of the Decal, without assigning any reason, provided that BCA shall exercise this right reasonably.
When can Green Mark Plaque and Decal be displayed?
Type of Scheme
|
Timing to submit request
|
Green Mark certification awarded to new development (during design stage/ construction stage)
|
The project completed and attained Temporary Occupation Permit (TOP)
|
Green Mark certification awarded to existing building and user centric schemes
|
Upon receiving Letter of Green Mark Award
|
Green Mark Residential Building, requiring Green Mark Decal display in showflats
|
Upon receiving Letter of Green Mark Award with showflats design and location confirmed
|
The request can be made using the appropriate form below.