Periodic energy audits are to ensure that cooling systems continue to operate efficiently throughout a building’s lifespan, allowing building owners to continuously reap energy saving benefits.
Process
Upon receiving notice from the Commissioner of Building Control, building owners must do the following in order:
- Engage the services of a professional mechanical engineer or a BCA-registered Energy Auditor to carry out the energy audit
- Submit the necessary documents to the Commissioner of Building Control
All energy audits must abide by the Code on Periodic Energy Audit of Building Cooling System.
Important documents
Download the following documents and submit completed forms to BCA.
Effective date
(based on energy audit report submission) |
Compliance Standard |
On or after 1 June 2023
|
|
Before 1 June 2023 |
|
Annual mandatory submission of building information and energy consumption data
Building owners must also submit building information and energy consumption data annually to BCA. This can be done using the Building Energy Submission System (BESS) using your BESS ID or SingPass.