Overview

From 1 Oct 2025, the Building Control (Fixed Installations) Regulations 2025 (BC (FI) Regs), the Building Control (Reportable Matters) Regulations 2025 (BC (RM) Regs) and the Building Control (Exempt Fixed Installations and Fixed Installation Works) Order 2025 (BC (Exempt FI) Order) will replace the Building Maintenance and Strata Management (Lift, Escalator and Building Maintenance) Regulations 2016 (LEBM Regs). These new regulations will govern legislative requirements for lifts, escalators, and mechanised car parking systems (MCPS), collectively defined as fixed installations (FIs).

The LEBM Regs, which currently regulate the maintenance and operation of lifts and escalators, will be repealed upon the commencement of the BC (FI) Regs, BC (RM) Regs and BC (Exempt FI) Order.

The BC (FI) Regs, BC (RM) Regs, BC (Exempt FI) Order and the corresponding provisions in the amendments to the Building Control Act will come into effect on 1 Oct 2025.

Major Changes in the New Regulations

In March 2020, the Building Control Act was amended with provisions to enhance the regulation of FIs. The key amendments relating to FIs include:

a) Submissions of FI plans for approval prior to their installation.

b) Registrations of both installation contractors for FI works and the service contractors for maintenance of FIs, as well as progressive wage model (PWM) for lift and escalator maintenance technicians. These came into effect on 9 December 2022 (see circular).

c) Reporting of incidents and potential systemic safety defects in building products.

Industry Briefing Sessions


a) Please click here for the slides on Industry Briefings on Building Control (Fixed Installations) Regulations 2025 and Building Control (Reportable Matters) Regulations 2025 conducted in January/February 2025. 

b) Please refer to this document for the frequently asked questions (FAQs).

Infographics

Infographics explaining the new Regulations can be found here: FI Regs infographics

FI Reg Social Media v4_01 FI Reg Social Media v4_02 
 FI Reg Social Media v4_03  FI Reg Social Media v4_04
 FI Reg Social Media v4_05  FI Reg Social Media v4_06
 FI Reg Social Media v4_07  FI Reg Social Media v4_08
  

Circular and Regulations

The circular and the new Regulations can be found below. 

Building Control (Fixed Installations) Regulations 2025 BC (FI) Regs 2025
Building Control (Reportable Matters) Regulations 2025 BC (RM) Regs 2025
Building Control (Exempt Fixed Installations and Fixed Installation Works) Order 2025 BC (Exempt FI) Order 2025
Circular on Implementation of Building Control (Fixed-Installations) Regulations 2025 and Building Control (Reportable Matters) Regulations 2025 Circular on FI Regs 2025
Circular on Revised Implementation Date For Building Control Regulations For Fixed Installations And Exterior Features Circular on Revised Date for FI Regs 2025

Guides and Reporting Templates

Please refer to the following guides, FormSG links, as well as the EITC Inspection Report Template below. QPs are encouraged to use the EITC Inspection Report Template as a reference from 1st October 2025. QPs must submit the EITC Inspection Report as part of our review for all PTO applications submitted from 1st January 2026.

Fixed Installations Submission Regime Guide
*Guide includes list of Certified Bodies
FI Plan Submission Regime Guide

Guide for Submission of Plans

Guide for Fixed Installation Plan Submission (FormSG)
FormSG Links for Submission (will be live only on 1st Oct 2025)  

Application for Approval of Fixed Installation Design Plan - 

Go to website: Go.gov.sg/fidesignplan

 

Submission of Fixed Installation Completion Record Plan –

Go to website: Go.gov.sg/firecordplan

 

Application for Alternative Solution for Fixed Installation –

Go to website: Go.gov.sg/fialtsoln

 

Application for Waiver/Modification of Fixed Installation Requirements –

Go to website: Go.gov.sg/fiwaiver

 FI Plans Submission details sheet  FI plans submission details sheet
 Guide for Obtaining Permit-To-Operate  Guideline for Obtaining PTO
 EITC Inspection Report Template for QP  To be released soon


Popular e-Services

CWRS

The Construction Workforce Registration System (CWRS) is an online portal for CoreTrade and Multi-skilling registration and the renewal of Direct R1 eligibility.

Overseas Testing Management System

OTMS allows you to register the workers for Identity Verification and to check your registration status online.

Lifts and Escalators Application (LEAP) Portal

Lift and escalator owners, contractors and Specialist Professional Engineers (SPEs) can apply for and view applications for Permit to Operate (PTO) here.