Integrated Construction and Prefabrication Hub (ICPH)

The built environment sector is increasingly adopting the use of precast and prefabricated building components to improve construction productivity in Singapore.To build up the local supply of such components, a masterplan was formulated for the development of Integrated Construction and Prefabrication Hubs (ICPHs) with 30-year lease term. 

ICPHs refer to multi-storey advanced manufacturing facilities, with a high degree of mechanisation and/or automation, which produce: 

a. Prefabricated individual components e.g. precast columns, beams, staircases 

b. Prefabricated integrated sub-assemblies e.g. Prefabricated Bathroom Units (PBUs), modular prefabricated Mechanical, Electrical and Plumbing (MEP) systems and/or 

c. Prefabricated Prefinished Volumetric Construction (PPVC) modules

Why ICPHs?

  • Improved productivity Prefabricating components off-site results in manpower and time savings at the project level.
  • Improved quality control –ICPHs are able to deliver high quality prefabricated components as production is carried out in a controlled factory environment.
  • Minimise dis-amenities on siteNoise and dust generated on-site is significantly reduced as most of the construction work is brought off-site.
  • Safer work environment and higher-skilled jobs –ICPHs automate most of the labour intensive construction work in a controlled factory environment. This creates a safer work environment, and allows workers to take on higher value added jobs. Skills in construction, manufacturing, logistics and information and communications technology will be sought after.
  • Multiple uses for ICPHs –These hubs can also be used for related construction activities such as storage of formwork, construction equipment etc. 

ICPHs awarded and details

BCA has to-date awarded five land tenders for the development of ICPHs through GeBIZ - the procurement portal for the Government, ministries and departments of Government and statutory boards at www.GeBiz.gov.sg. Information on past tenders is shown in the following table:

Date of Tender Launch

Date of Tender Award

Location

Site Area (m2)

Maximum Gross Plot Ratio

ICPH Operator

Product Range

16 May 2012

28 February 2013

Kaki Bukit Road 6 (KB 1 and KB 2)

20,385.6

1.600

SEF Construction Pte Ltd
(acquired by CKR CONTRACT SERVICES PTE LTD officially on February 2020)

i. Façade walls, columns, beams, slabs

ii. Refuse chutes, household shelters, staircases

iii. Lightweight panelised PBUs

iv. Hollow core slabs

v. Pre-stressed planks

vi. Large panel slabs

31 July 2013

16 June 2014

20,051.0

1.600

Straits Construction Singapore Pte Ltd

i. Façade walls, columns, beams, slabs

ii. Refuse chutes, staircases

iii. Lightweight panelised PBUs and Prefabricated Kitchen Units

iv. Hollow core slab and pre-stressed beams

v. Large Panel Slabs

30 October 2014

21 September 2015

Airport Road (Defu 1 and Defu 2)

20,411.4

1.600

Soil-Build (Pte) Ltd

i. Façade walls, columns, beams, slabs

ii. Staircases

iii. Concrete PBUs

iv. Hollow core slabs

v. Large Panel Slabs

30 January 2015

12 May 2016

20,410.7

1.600

Teambuild Engineering & Construction (Pte) Ltd

i. Precast tunnel segments

ii. Concrete PPVC modules and PBUs

7 July 2017

27 July 2018

Pulau Punggol Barat (PPB 1)

38,421.8

1.700

HL-Sunway JV Pte Ltd

i. Façade walls, columns, beams, slabs

ii. Refuse chutes, household shelters, staircases, water tanks

iii. Concrete PPVC modules and PBUs

iv. Large Panel Slabs


Popular e-Services

CWRS

The Construction Workforce Registration System (CWRS) is an online portal for CoreTrade and Multi-skilling registration and the renewal of Direct R1 eligibility.

Overseas Testing Management System

OTMS allows you to register the workers for Identity Verification and to check your registration status online.

Lifts and Escalators Application (LEAP) Portal

Lift and escalator owners, contractors and Specialist Professional Engineers (SPEs) can apply for and view applications for Permit to Operate (PTO) here.