×
!

Buildability Score

Click on the link to download the forms.

Form Descriptions
BPD_BP01 Request for Pre-submission Consultations
BPD_BP03 Application for Approval of Building Plans
BPD_BP04 ETTV/RETV Calculation Format in respect of an Air-conditioned Building
BPD_BP05 Application for Modification/Waiver of Building Regulations
BPD_BP08 Application for Withdrawal of Plans of Building Works
BPD_BP09 Application for Permit to Erect Temporary Buildings
BPD_BP10 Window to Wall Ratio (WWR) & Shading Coefficient (SC) Calculation Format in Respect of Residential Building
BCA-BP-SGFA-NewRate Summary of Statistical Gross Floor Area (SGFA) and Area of Plan View [revised as of Aug 2022]
BPD_QP01 Notification of Appointment of Qualified Person and Project Reference Number and Title
BPD_QP03 Notice of Termination of Appointment
BPD_CSC01 Application for TOP/CSC
BPD_CSC02 Certificate of Supervision Building Works
BPD_CSC03 Certificate of Design and Supervision of Lightning Protection System
BPD_CSC04 Certificate of Supervision of Installation of Escalator(s)/Lift(s)
(Revised form with effect from 15 Jan 2019)
BPD_CSC05 Certificate of Supervision of Mechanical Ventilation/Air-conditioning System(s)
BPD_CSC06 Certificate of Supervision for Temporary Building Works
BPD_CSC07 Declaration by Qualified Person for the Application of TOP/CSC for Building Works
BPD_ETOP Request for Express Temporary Occupation Permit
BC/BC Builder's Certificate of Completion of Building Works
BPD_CCS01 Certificate of Compliance of Constructability Score
BPD_BS01 COP 2011 [Ver_Jul_2011] Submission of Buildable Design Score Calculations
(for projects with date of planning application from 15 Jul 2011 to 31 Aug 2013)
BPD_BS01_COP 2013 [Ver_Sep_2013] Submission of Buildable Design Score Calculations
(for projects with date of planning application from 1 Sept 2013 to 31 Oct 2014)
BPD_BS01_COP 2014 [Ver_Nov_2014] Submission of Buildable Design Score Calculations
(for projects with date of planning application from 1 Nov 2014 to 30 Nov 2015)
BPD_BS01_COP 2015 [Ver_Dec_2015] Submission of Buildable Design Score Calculations
(for projects with date of planning application from 1 Dec 2015 to 30 Apr 2017)
BPD_BS01_COP 2017 [Ver_May_2017] Submission of Buildable Design Score Calculations
(for projects with date of planning application from 1 May 2017 to 14 Dec 2019)
BPD_BS01_COP 2019 [Ver_Dec_2019]
Submission of Buildable Design Score Calculations
(for projects with date of planning application on or after 15 Dec 2019)
BPD_BS01_COP 2020 [Ver_Dec_2020-2]
Submission of Buildable Design Score Calculations 
(for projects with date of planning application from 28 Dec 2020 to 29 April 2022)
BPD_BS01_COP 2022 [Ver_Apr_2022-2]

Submission of Buildable Design Score Calculations 
(for projects with date of planning application from 30 Apr 2022)

BPD_BS01_COP 2022 [Ver_Apr_2023]



Submission of Buildable Design Score Calculations 
(for projects with date of planning application from 1 April 2023)
BPD_BS02 COP 2011 [Ver_Jul_2011] Submission of Structural Buildable Design Score Calculations
(for projects with date of planning application from 15 Jul 2011 to 31 Aug 2013)
BPD_BS02_COP 2013 [Ver_Sep_2013] Submission of Structural Buildable Design Score Calculations
(for projects with date of planning application from 1 Sept 2013 to 31 Oct 2014)
BPD_BS02_COP 2014 [Ver_Nov_2014] Submission of Structural Buildable Design Score Calculations
(for projects with date of planning application from 1 Nov 2014 to 30 Nov 2015)
BPD_BS02_COP 2015 [Ver_Dec_2015] Submission of Structural Buildable Design Score Calculations
(for projects with date of planning application from after 1 Dec 2015 to 30 Apr 2017 )
BPD_BS02_COP 2017 [Ver_May_2017] Submission of Structural Buildable Design Score Calculations
(for projects with date of planning application on or after 1 May 2017)
BPD_BS03 COP 2011 [Ver_Jul_2011] Submission of As-built Buildable Design Score Calculations
(for projects with date of planning application from 15 Jul 2011 to 31 Aug 2013)
BPD_BS03 COP 2013 [Ver_Sep_2013] Submission of As-built Buildable Design Score Calculations
(for projects with date of planning application from 1 Sep 2013 to 31 Oct 2014)
BPD_BS03_COP 2014 [Ver_Nov_2014] Submission of As-built Buildable Design Score Calculations
(for projects with date of planning application from 1 Nov 2014 to 30 Nov 2015)
BPD_BS03_COP 2015 [Ver_Dec_2015] Submission of As-built Buildable Design Score Calculations
(for projects with date of planning application from 1 Dec 2015 to 30 Apr 2017)
BPD_BS03_COP 2017 [Ver_May_2017] Submission of As-built Buildable Design Score Calculations
(for projects with date of planning application from 1 May 2017 to 14 Dec 2019)
BPD_BS03_COP 2019 [Ver_Dec_2019]
Submission of As-built Buildable Design Score Calculations 
(for projects with date of planning application from 15 Dec 2019 to 27 Dec 2020)
BPD_BS03_COP 2020 [Ver_Dec_2020-2]
Submission of As-built Buildable Design Score Calculations
(for projects with date of planning application from 28 Dec 2020 to 29 Apr 2022)
BCA-BP-AS Schedule of Alternative Solutions
Form_List_Status Forms Status

 

Click here to download the entire set of forms

For submission in compliance with the Building Control (Environmental Sustainability) Regulations 2008, please go to Green Mark e-filing Portal for the generation of the following forms.

  • BPD_GM01 (Green Mark score calculations for residential and non-residential buildings) at BP stage
  • BPD_GM02 (As-built Green Mark score calculations for residential and non-residential buildings) at TOP stage
For more information on the regulation, please refer to Legislation on Environmental Sustainability.

Popular e-Services

CWRS

The Construction Workforce Registration System (CWRS) is an online portal for CoreTrade and Multi-skilling registration and the renewal of Direct R1 eligibility.

Overseas Testing Management System

OTMS allows you to register the workers for Identity Verification and to check your registration status online.

Lifts and Escalators Application (LEAP) Portal

Lift and escalator owners, contractors and Specialist Professional Engineers (SPEs) can apply for and view applications for Permit to Operate (PTO) here.